The Shenzhen OCT Tower is an office building and commercial complex located in a dynamic business area of the Nanshan district in China. It was designed by Parsons Brinckerhoff Consultants Private Limited and developed by Shenzhen OCT Properties Company Ltd; and is comprised of a main 300 meter high-rise building (60 floors) and a few low buildings.


<< Download Bermad Case Study >>

Challenge

During the design and planning of the building, the owner of the Shenzhen OCT Tower turned to BERMAD for help with optimizing the building’s water system. The owner was impressed with the professionalism demonstrated by BERMAD, and selected BERMAD as one of three suppliers of hydraulic control valves for the water system.

BERMAD reviewed the original designs and pointed out that the plan to use relief valves and pressure reducing valves of the same size may cause problems. Also, in places where the pressure differential is high, the use of two piloted pressure reducing valves one after the other on the same line can potentially cause hunting problems.Bermad Hydraulic Control valves

The BERMAD Solution

In order to prevent potential hunting problems in places where the pressure differential is high, BERMAD recommended using a proportional valve before a piloted pressure reducing valve instead of two piloted pressure reducing valves one after the other.

As part of the overall solution, BERMAD supplied pressure reducing valves (Model 720-PD420), relief valves (Model 730430), level control valves (Model 450-60) for the plumbing system and fire protection system of the Shenzhen OCT Tower.

Results

As a result of the water system optimization of the Shenzhen OCT Tower, the water system became more reliable and the total cost of equipment was reduced. In addition to being part of this optimization effort, BERMAD also offered consistent technical support throughout the project and both the owner and the contractor gave positive feedback about the support received.

Learn How BERMAD Helps Optimize Water System for Shenzhen OCT Tower in China - Download BERMAD Case Study

Topics: Building & Construction, Level control valves, Pressure Reducing Valve

Rebecca Zhao

Written by Rebecca Zhao

Sales Director for Building & Construction Segment of Bermad China. She leads the team to work in long term with designers, end users and contractors to introduce Bermad 's advanced and reliable hydraulic solution for high-rise buildings.

Learn How BERMAD Helps Optimize Water System for Shenzhen OCT Tower in China - Download BERMAD Case Study

Recent Posts

Never miss a story