Water Control Solutions

BERMAD Fire Protection

East African Crude Oil Pipeline (EACOP) Project

Have you heard about the world's longest, heated crude oil pipeline? Developed through a collaborative effort between: Tanzania Petroleum Development Corporation (TPDC), TotalEnergies, and China National Offshore Oil Corporation (CNOOC), the groundbreaking project of EACOP (stands for: East African Crude Oil Pipeline) is designed to facilitate the

Read more
01 May 2018
Last updated date: 6 Jan 2019
Paul Goldsmith
By
Paul Goldsmith

How to install a BERMAD Pre-Action Valve

This video presents the basic installation and the initial priming instructions for a BERMAD 7BM pre-action valve from the time you receive it, through to the installation and initial operation.

Read More

Topics: Fire Protection, Pre-Action Valve

Load More