Water Control Solutions

BERMAD Waterworks

Case Study: Implementing a New Pipeline System in one of the World’s Oldest Cities

The Challenge

Jerusalem is the capital city of Israel, and it is located in the middle of the country. In addition to the large number of tourists visiting this historical city annually, Jerusalem also has a population of more than 900,000 people, and in 1994, the yearly drinking water consumption was approximately 60M cubic meters; 2,120 cubic

Read more

Joan Manuel Diaz

Joan Manuel Diaz
Mining marketing segment manager BERMAD

Recent Posts

The Challenge

Faced with erratic pressure control and inaccurate leaching rate control, a Chilean mining company, Compañía Minera Lomas Bayas S.A., needed an effective solution. The company had been using manually-operated diaphragm valves and orifice plates to control the flow and leaching rate inside the leaching modules, which meant personnel had to be present at all times to manually open and close the diaphragm valves, which incurred high operational costs.

Read More

Topics: Pressure Reducing Valve

Load More